Rated Water head: 3.9m
Rated Water flow: 3m3/s
Manual and electrical governor 100kw brushless excitation generator and control system (Stand Alone System) Forthe 100Kw power plant is installed beside a big river, at Azad Kashmir, Pakistan. This power plant only makes use of 1/10 of the water flow. In this place, this is the first power plant, without any grid which can supply power to near by villages. From then on, the Kashmir village people can read and write can pray with light at night.
The Kaplan unit that Fuchun supplied is easy to installed, good quality,
and easy to operation, also supplied with warm and considerate after
sale service at site or through internet. When ever you need our help,
our professional engineers will action immediately.